This is the view of the bay doors being blocked off while the widening process takes place. Soon the newly fabricated bi-fold doors will be delivered and installed.
The watch desk is going to be built in the middle of the bays, the raised concrete slab is already there.
The watch desk is going to be built in the middle of the bays, the raised concrete slab is already there.
Roy J. Ward
DCFD
Sergeant
Tower 3 Platoon 2
DCFD
Sergeant
Tower 3 Platoon 2