After checking the CIP schedule, FS198 is scheduled for construction in FY19... All it says is "northwest part of the city." Kinda vague, so I don't think an exact location has been established. It was originally slated for FY17, but got pushed back because of the economy. However, based on how much growth has restarted, I would be surprised if it can wait until FY19.
John I.
Fire/EMS Dispatcher / EMT-B
Fire Apparatus Photographer / Hobbyist
www.fireapparatusphotos.com
www.flickr.com/image7801
Nikon D5600 (retired: Nikon D90) / Nikkor 18-55mm f3.5-5.6 / Nikkor 35mm f/1.8
Fire/EMS Dispatcher / EMT-B
Fire Apparatus Photographer / Hobbyist
www.fireapparatusphotos.com
www.flickr.com/image7801
Nikon D5600 (retired: Nikon D90) / Nikkor 18-55mm f3.5-5.6 / Nikkor 35mm f/1.8