Quote:Can you break down what all that is?We use the Minuteman load as I said so
Left to right
200' 1 3/4
250' 1 3/4
250' 2 1/2
Upper part with the 2 1/2 gated wye is 300' of 2 1/2 for some long lays in there first due area(is pre connected). Below that is our stand pipe packs both sides.
Upper part is I believe another 200' of 2 1/2 dead load. 900' of 5"