Taken today:
This is the Spare Rescue-1 apparatus, a 2000 ALF. It was repainted and had body work done in 2010. We will be in this rig for a while, as we cracked the chassis and box on our 2007 ALF Heavy Rescue rig. Estimates on time to get our regular front line rig back is up to a year, we are hearing, while the issues are worked out with (the mess of) ALF.
Since we will have her back for a while, I recently added lettering and decals to her. The rig served us well front line from 2000-2007 (although the same thing happened to it as the 07 mentioned above)
This is the Spare Rescue-1 apparatus, a 2000 ALF. It was repainted and had body work done in 2010. We will be in this rig for a while, as we cracked the chassis and box on our 2007 ALF Heavy Rescue rig. Estimates on time to get our regular front line rig back is up to a year, we are hearing, while the issues are worked out with (the mess of) ALF.
Since we will have her back for a while, I recently added lettering and decals to her. The rig served us well front line from 2000-2007 (although the same thing happened to it as the 07 mentioned above)


Facebook
Google
Reddit
Twitter