Don't forget, with the bid going out now, it's going to take a lot longer to go through the steps,work with the manufacturer to get the protype built, make changes, and then build the rest. Then add in FDNY acceptance testing, tool mounting, training, etc and you probably won't see these rigs on the streets until mid-late 2017.
Seth Granville
My Photos: x635Photos.com
My Photos: x635Photos.com