[quote name='KFDI3' post='157852' date='Oct 22 2007, 22:18 ']How are the hoseloads configured on a Philly Engine ? I wondered because of all the hose bed dividers.[/quote]
Hose loads vary from company to company depending on the area that they cover. The basic hose load for a pipeline company, which all of the new LaFrance compnaies are going to is two sections for 5 inch line (for a total of 1000 feet), two sections of three inch, and the rest 1 3/4. One of the sections will have three lengths of three inch and three lengths of 1 1/3 connected by a gated wye. This line is preconnected. It is commonly referred to as "3 over 3".
Hose loads vary from company to company depending on the area that they cover. The basic hose load for a pipeline company, which all of the new LaFrance compnaies are going to is two sections for 5 inch line (for a total of 1000 feet), two sections of three inch, and the rest 1 3/4. One of the sections will have three lengths of three inch and three lengths of 1 1/3 connected by a gated wye. This line is preconnected. It is commonly referred to as "3 over 3".