[quote name='oneilljb' post='185154' date='Jan 30 2008, 08:02 ']The area where the cross lays previously were is now space for backboards, little ladder, and a hotel pack.[/quote]
Barry,
The little ladder storage can be seen at the rear of the pump panel, not the typical preconnect location.
I guess the backboards would be okay, but I do not see the hotel packs being stored up there. Too much of a headache to get them up and down. I actually like my idea of putting a long dead load of 1 3/4" hose and pulling what you need OR a 2 1/2" preconnected line. I may change my mind after seeing them when they get here, but thats what I come up with just thinking about it.
Also, they should be in town in about a week according to out shop Manager.
Barry,
The little ladder storage can be seen at the rear of the pump panel, not the typical preconnect location.
I guess the backboards would be okay, but I do not see the hotel packs being stored up there. Too much of a headache to get them up and down. I actually like my idea of putting a long dead load of 1 3/4" hose and pulling what you need OR a 2 1/2" preconnected line. I may change my mind after seeing them when they get here, but thats what I come up with just thinking about it.
Also, they should be in town in about a week according to out shop Manager.