Green Bay Engine 1
L-R: 2 200' 1 3/4"
1000' 5"
800 ' 2 1/2" split- 400' with gated wye with 100' of 1 3/4" (lead line or Chicago lay), 400' static load with smooth bore
200' 2 1/2" with smooth bore (blitz line)
We use the "lead line" a lot due to many 2 1/2 story houses in our district.
The 800' looks a little sloppy due to no divider. We have asked numerous times but "they" say there is no money. Currently we are using flatten cardboard boxes to separate these loads.
L-R: 2 200' 1 3/4"
1000' 5"
800 ' 2 1/2" split- 400' with gated wye with 100' of 1 3/4" (lead line or Chicago lay), 400' static load with smooth bore
200' 2 1/2" with smooth bore (blitz line)
We use the "lead line" a lot due to many 2 1/2 story houses in our district.
The 800' looks a little sloppy due to no divider. We have asked numerous times but "they" say there is no money. Currently we are using flatten cardboard boxes to separate these loads.