Green Bay Engine 1
L-R: 2 200' 1 3/4"
1000' 5"
800 ' 2 1/2" split- 400' with gated wye with 100' of 1 3/4" (lead line or Chicago lay), 400' static load with smooth bore
200' 2 1/2" with smooth bore (blitz line)
We use the "lead line" a lot due to many 2 1/2 story houses in our district.
The 800' looks a little sloppy due to no divider. We have asked numerous times but "they" say there is no money. Currently we are using flatten cardboard boxes to separate these loads.
L-R: 2 200' 1 3/4"
1000' 5"
800 ' 2 1/2" split- 400' with gated wye with 100' of 1 3/4" (lead line or Chicago lay), 400' static load with smooth bore
200' 2 1/2" with smooth bore (blitz line)
We use the "lead line" a lot due to many 2 1/2 story houses in our district.
The 800' looks a little sloppy due to no divider. We have asked numerous times but "they" say there is no money. Currently we are using flatten cardboard boxes to separate these loads.

Facebook
Google
Reddit
Twitter