Thanks guys!
So if I understand, you could have either 2 2.5" supply lines or one long one?
I had seen it before but felt goofy asking!
My dept. ran 2.5 supply lines like most did. We had split beds but never had any male/female ends out on the bottom of the load.
Our load out now is pretty basic,
800 to 1000 foot of 5"
500 foot of 2.5 for what ever the need may be
200 foot 2.5 pre connect off the back
150 and 200 1.75 cross lays.
On a side note anyone have a"layout" while driving down the road! We laid about 800 foot of 5" once <img src='http://www.firepics.net/groupboards/public/style_emoticons/<#EMO_DIR#>/biggrin.gif' class='bbc_emoticon' alt='
' />
Tried to tell the powers that be hose bed covers are a good idea
So if I understand, you could have either 2 2.5" supply lines or one long one?
I had seen it before but felt goofy asking!
My dept. ran 2.5 supply lines like most did. We had split beds but never had any male/female ends out on the bottom of the load.
Our load out now is pretty basic,
800 to 1000 foot of 5"
500 foot of 2.5 for what ever the need may be
200 foot 2.5 pre connect off the back
150 and 200 1.75 cross lays.
On a side note anyone have a"layout" while driving down the road! We laid about 800 foot of 5" once <img src='http://www.firepics.net/groupboards/public/style_emoticons/<#EMO_DIR#>/biggrin.gif' class='bbc_emoticon' alt='
![Big Grin Big Grin](https://firepics.net/MyBB/images/smilies/biggrin.png)
Tried to tell the powers that be hose bed covers are a good idea