Not the best picture but with a high of 24 degrees today (without the wind) I wasn't going to pull the truck out of the station.
York, ME Engine 4 from L to R 300' 1 3/4" pre con. under that is another 300' of 1 3/4" dead load. Next is 1000' of 4" connected to another 1000' of 5" with a HAV mounted to the step. Next is 300' of 2 1/2" pre con. with another 200' dead load under that. Why so much hose you may ask? This is our 2nd out pump and her primary job is water supply the 1000' of 5" goes first and if needed we have the extra 1000' of 4" ready to continue the lay.
York, ME Engine 4 from L to R 300' 1 3/4" pre con. under that is another 300' of 1 3/4" dead load. Next is 1000' of 4" connected to another 1000' of 5" with a HAV mounted to the step. Next is 300' of 2 1/2" pre con. with another 200' dead load under that. Why so much hose you may ask? This is our 2nd out pump and her primary job is water supply the 1000' of 5" goes first and if needed we have the extra 1000' of 4" ready to continue the lay.