here is a factory photo of Weyburn, Saskatchewan's 1954International/American Marsh Pumps Canada (Stratford,Ontario)
as originally delivered with a 55' Memco electrically powered aerial. At the time, FIRE ENGINEERING called this the first quint to be delivered in Western Canada. The aerial was removed and the body shortened in the early 1990's (as pictured in the post above) by Pozium a small regional builder in Preeceville, Saskatchewan.
as originally delivered with a 55' Memco electrically powered aerial. At the time, FIRE ENGINEERING called this the first quint to be delivered in Western Canada. The aerial was removed and the body shortened in the early 1990's (as pictured in the post above) by Pozium a small regional builder in Preeceville, Saskatchewan.