This is probably one of the better threads I've seen...I've become a little obsessed with hose loads! Keep 'em coming! <img src='http://www.firepics.net/groupboards/public/style_emoticons/<#EMO_DIR#>/luxhello.gif' class='bbc_emoticon' alt='' />
So if you all needed a 2.5 hand line, did you snag the sections out of the supply bed?[/quote]
Well after you had laid out the supply line, then you could pull what ever additional 2-1/2" line off you needed and put a nozzle on it and take it in. If you were going to use the wye, then the driver or some one would pull enough line off to be near the front door or where you were going to make an entrance and the other members would attached the wye after laying it out. Hopefully before the pump operator down the street loaded that 1-1/2 line. The first photo of the AmLaFrance had double 2-1/2" discharges on the rear. Sometime after this photo was taken, any rigs that had this set up was ordered to make up at least one preconnected 2-1/2" lay to either or both rear discharges. I was a Lt at the 21's and had the twin to Wagon 1 as an triple combination pumper and if memory serves me correctly we had one 2-1/2" preconnect and the other discharge had a connection set up for a foam eductor. I will see if I have a photo of that ride and post it later.
Wagonman, I am glad I could make you feel younger and take you back a few years like we
"old" guys had to operate.
John Hinant Retired Member of Richmond VA Fire Bureau
October 25, 1858 - October 25, 2020 = 162 years old The sixth oldest paid, documented, Fire Department in the United States First established in 1782
"In God We Trust - All Others We Take For Granted"
02-09-2008, 07:10 PM (This post was last modified: 02-09-2008, 07:15 PM by memphise34a.)
[quote name='Truckman' post='187689' date='Feb 9 2008, 12:46 ']Well after you had laid out the supply line, then you could pull what ever additional 2-1/2" line off you needed and put a nozzle on it and take it in. If you were going to use the wye, then the driver or some one would pull enough line off to be near the front door or where you were going to make an entrance and the other members would attached the wye after laying it out.[/quote]
John,
This is exactly what we do - except backwards. We keep the wye and the 1 3/4" hose hooked up and disconnect the wye and attach a nozzle if we want to lead out with the 2 1/2" hose or lay a 2 1/2" supply line with the appropriate adapters.
I will get those other pics up tomorrow when I am back at work.
[quote name='JFong' post='187778' date='Feb 9 2008, 20:37 ']They carry 400' of the 1.5 and 1.75. Some rigs carry 500 or 600' of the 1" hose depending on their district.[/quote]
[quote name='JFong' post='187778' date='Feb 9 2008, 20:37 ']They carry 400' of the 1.5 and 1.75. Some rigs carry 500 or 600' of the 1" hose depending on their district.[/quote]
Front bumper - Short section of 5" supply hose used for front intake. As far as I know, this is the only section in the city used like this. The rest of the companies run with 6" soft suction supply hose. Also has 100' of 1 3/4" hose. Use this as an example of how to NOT set your bumper up. Definately go with seperate trays.
(3) 50' shoulder loads used for standpipe connections.
5" in the right bed, just out of the frame. Center bed - Close up of 750' of 2 1/2" wyes into (2) 150' sections of 1 3/4" hose in the left bed. The first 50' of both lines and the nozzles are budled into a single shoulder load.
Not the best picture but with a high of 24 degrees today (without the wind) I wasn't going to pull the truck out of the station.
York, ME Engine 4 from L to R 300' 1 3/4" pre con. under that is another 300' of 1 3/4" dead load. Next is 1000' of 4" connected to another 1000' of 5" with a HAV mounted to the step. Next is 300' of 2 1/2" pre con. with another 200' dead load under that. Why so much hose you may ask? This is our 2nd out pump and her primary job is water supply the 1000' of 5" goes first and if needed we have the extra 1000' of 4" ready to continue the lay.
Fort Lauderdale's setup is fairly simple. Flat load bed of 1000' of 5" supply line, with 800' of 2-1/2" flat loaded with the male out with a water thief on the end. This is the setup for the 5 new engines delivered in 2005 to E2, E16, E46, E47 and E88. All other engines have an identical setup except with 1500' of supply line, and 3" hose instead of 2-1/2". The setup with the water thief is useful mainly for garden apartment setups and docks, but can be used for any other long hose stretch. The line is stretched off the rear and used in conjuction with the high-rise packs for fire attack. The water thief allows the versatility to use either 2-1/2" or 1-3/4" attack lines off the end of the leader line stretch.
The crosslays on all engines are identical with two beds of 200' of 1-3/4" and one bed of 200' of 2-1/2". Usually one of the two 1-3/4" lines has a 7/8" smoothbore, and the other has a breakaway nozzle setup with a 150 gpm @ 50 psi fog nozzle on top of 15/16" smoothbore. The 2-1/2" preconnect has a 1-1/8" smooth bore nozzle.
The loads are identical in that the first 100' is flat loaded, then the four loops are formed across the width of the crosslay bed, and then the remaining hose is loaded on top of the loops. Last step is to fold the loops back into the crosslay bed for organization and so they don't get caught and/or fall out on anything.