Oh I've been down that road before, the stories I could tell just on that subject alone. Had a call 10 minutes before final inspection once
saying they forgot to purchase two cots at a total of $7.500.00 and the deal was off without them! Thank god for demo's still it was not
fun having to deal with my bosses ripping me for having such a large ticket item added, when I had nothing to do with it. Oh well.
The issue is with a new product never built before there are so many unknowns I think you need a slush fund just for such emergencies.
I went thru this on a special dive unit once and we used every part of $20,000.00 slush fund in changes even after throwing in items.
A new design is a tight rope for any salesmen to walk and I truly sympathize with them on those projects. It's too bad for the most part
the departments and manufactures don't appreciate everything the salesmen does on these type of projects.
Kris
saying they forgot to purchase two cots at a total of $7.500.00 and the deal was off without them! Thank god for demo's still it was not
fun having to deal with my bosses ripping me for having such a large ticket item added, when I had nothing to do with it. Oh well.
The issue is with a new product never built before there are so many unknowns I think you need a slush fund just for such emergencies.
I went thru this on a special dive unit once and we used every part of $20,000.00 slush fund in changes even after throwing in items.
A new design is a tight rope for any salesmen to walk and I truly sympathize with them on those projects. It's too bad for the most part
the departments and manufactures don't appreciate everything the salesmen does on these type of projects.
Kris