Engine 23's monitor pipe was in operation for the duration:
It was pretty much under control in 2 1/2 hours. They continued pulling the smoldering cars off of the pile to finish wetting down.
It was pretty much under control in 2 1/2 hours. They continued pulling the smoldering cars off of the pile to finish wetting down.